PREVIEW BUILD · Yellow tags mark details Darren must confirm before launch. Forms do not submit.
Service

Adding a unit? Start with what's already there.

ADUs, additions, second stories, and rebuilds begin with an understanding of the existing structure, site conditions, and loads. Make the big decisions with engineering information in hand.

An ADU or addition changes how your building carries weight. Add a level and every load below it has to be rechecked and often rerouted. We design a clear load path, deliver a complete plan set and give you a realistic timeline from day one.

Detached backyard unitStock image: replace with project photography

Does an ADU need a structural engineer?

Many ADUs and additions require structural calculations and drawings for foundations, framing, and connections. The actual scope depends on the design, existing conditions, and local permitting requirements. We help determine what the structure needs before construction begins.

Can my house support a second story?

Not without examining the loads and what carries them. We review the existing framing, walls, connections, and foundations to determine whether reinforcement or a different approach is needed.

What about fire rebuilds?

A rebuild is a chance to do it right and sometimes to add space. On one North Hollywood fire rebuild, adding a lower-level ADU turned two stories into three, which doubled the load transfers the design had to handle. We engineered the new load path so the building could grow safely.

ADU and addition FAQs

Do I need a structural engineer for an ADU in Los Angeles?

For most ADUs, yes. New construction, garage conversions with new openings, and units built above or below existing space all need structural design and stamped plans for permit.

How long does ADU plan check take in Santa Monica or LA?

It varies with City workload. We had a Santa Monica ADU review that typically took 8 to 10 weeks stretch to three and a half months. Plan for the review from day one and submit a complete package.

Can I convert my garage into an ADU?

Often, yes. The structural questions are usually the new door and window openings, the existing slab and footings, and any added height. We check them early so the design doesn't change mid-permit.

Can you engineer a fire rebuild with more space than before?

Yes. Rebuilds are a good time to add an ADU or a story, as long as the new load path is designed in from the start.

"I can keep people as aspirational as they want to be, and still keep them realistic." — Darren Watson

Planning an ADU or addition?

Bring us in before the design is locked.