Engineering for spaces that keep Downtown moving.
Tenant improvements, building alterations, and upgrades to older structures require an early understanding of existing conditions, new loads, and the permit process.
Downtown work runs on leases and older buildings. Office and retail tenants need to open on time, and owners of older concrete buildings face long-horizon retrofit requirements. Darren's dream project is an entire floor of a downtown tower: the kind of build-out where opening a floor between two levels turns two departments into one organization. Someone has to move the loads around an opening the building was never designed for. That's us.
Stock image: replace with project photographyWhat should DTLA owners and tenants plan for?
Tenants: as-builts, slab and ceiling capacity, and plan-check time built into the opening date. Owners of older concrete buildings: start retrofit planning early and phase it with tenant turnover verify.
Questions we hear
Do you engineer high-rise tenant improvements downtown?
Yes, we engineer tenant improvements within high-rise buildings, including openings between floors.
Can you add a stair or opening between two office floors?
Often, yes. It means rerouting loads around the new opening, which we design and coordinate with the building's existing structure.
When should a DTLA concrete building owner start retrofit planning?
Now. Long timelines reward owners who plan and phase the work, and punish the ones who wait.
"The goal is to get the doors open." — Darren Watson