PREVIEW BUILD · Yellow tags mark details Darren must confirm before launch. Forms do not submit.
Location

Structural engineering for the Westside's changing spaces.

From Santa Monica and Venice remodels to ADUs, storefronts, and tenant improvements, we help project teams work through the structural realities of existing buildings.

Westside projects tend to be tight lots, older buildings and big ambitions: open floor plans in condos, wall-to-wall glass in Venice, ADUs on every block. Some of our clearest lessons come from here. In Santa Monica, a kitchen column turned out to run through all three floors of a building; we caught it before demo and saved the owner about $50,000. In Venice, an unengineered promise of 35 feet of accordion doors became a six-figure moment frame mid-construction.

Open living space with structure concealed in the ceilingStock image: replace with project photography

What should Westside owners know before a remodel?

Many Westside buildings are older, and the year a building was built tells an engineer things nobody else will. Condo and multifamily columns often carry more than your unit. And Santa Monica plan check has its own timeline: one ADU review we expected at 8 to 10 weeks took three and a half months.

Questions we hear

Do you work in Santa Monica, Venice and Culver City?

Yes, across the Westside including Santa Monica, Venice, Mar Vista, Culver City, Brentwood and Pacific Palisades.

Can I remove a column in my Santa Monica condo?

Maybe, but it may be holding up the floors above and below. We draw the building first so you know the cost before you plan the kitchen around it.

How long does Santa Monica plan check take?

It varies with workload. Plan for months, not weeks, and submit a complete package so you don't go back into the line.

"I can keep people as aspirational as they want to be, and still keep them realistic." — Darren Watson

Planning something?

Call before you call the contractor.