PREVIEW BUILD · Yellow tags mark details Darren must confirm before launch. Forms do not submit.
Service

Engineering for businesses that can't afford to open late.

Restaurants, medical offices, retail, and workplaces all depend on the building beneath the business. We assess structural changes early, coordinate with your project team, and help reduce surprises before construction begins.

When you lease a commercial space, you get keys. You do not get a map of what's inside the walls, above the ceiling or under the slab. And every month the doors aren't open, you are paying rent on a space that isn't earning. Sterling-Watson finds the structural surprises first, so they become a conversation instead of a delayed opening.

Commercial storefrontStock image: replace with project photography

What does a structural engineer do on a tenant improvement?

We study the existing structure before the floor plan changes. Removing walls, cutting new openings, installing rooftop equipment, or adding heavy loads can affect slabs, beams, columns, and foundations. Our job is to define the structural requirements clearly enough for the architect and contractor to build with confidence.

Why bring the engineer in before you sign the lease?

A lease rarely tells you what is behind the walls or beneath the slab. Ask for available as-built drawings, clarify responsibility for known deficiencies, and evaluate equipment loads or major openings before committing to a space. Discovering constraints early gives the business more options.

  • Are there known structural deficiencies, and under the lease, who pays to fix them?
  • Can I get the as-built plans from the original construction and the last TI?
  • Will the slab carry my equipment? How thick is it, and where is the rebar?
  • What issues keep coming back in this building?
  • Can a structural engineer walk it with me?

How do you keep plan check from delaying the opening?

No engineer controls a city's review calendar. What we can do is coordinate a complete structural scope, address predictable questions before submittal, and work with the design team to respond efficiently when comments arrive.

What kinds of commercial projects do we take on?

Restaurants, medical, dental and veterinary offices, retail stores, office build-outs, multifamily common areas and mixed-use spaces. We focus on tenant improvements of 5,000 square feet and larger, including multi-floor interiors and high-rise tenant improvements.

BUILD NOTE · Case studies block: add

Tenant improvement FAQs

Do I need a structural engineer for a tenant improvement in Los Angeles?

If your build-out removes or adds walls or columns, cuts new openings, adds heavy equipment or rooftop units, or changes how loads move through the building, yes. The City will require stamped structural plans, and finding problems early protects your opening date.

How long does plan check take for a commercial TI in LA?

In our experience, initial plan check commonly takes 8 to 12 weeks, plus clearances from other departments. The City isn't bound to your schedule, so the part you control is submitting a complete, coordinated package the first time.

Can the slab in my space handle heavy equipment?

Sometimes, and you need to know before you sign. We check slab thickness, reinforcement and existing conditions, and if it can't carry the load we design the fix and price it before you commit.

Who pays for structural problems in a leased space, the landlord or the tenant?

It depends on your lease. That is why the first question to ask before signing is whether there are known structural deficiencies and who is responsible for them. We can walk the space so you negotiate with real information. This is not legal advice; have your attorney review the lease terms.

Can you help if my lease is already signed?

Yes. Call us before demolition starts. The earlier we see the space, the more options you have and the fewer change orders you will face.

"The goal is to get the doors open." — Darren Watson

Considering a lease?

Walk it with an engineer first.