PREVIEW BUILD · Yellow tags mark details Darren must confirm before launch. Forms do not submit.
Service

Seismic resilience starts with understanding the building.

From soft-story apartment buildings to older concrete structures, we evaluate vulnerabilities and develop retrofit approaches that respect both building performance and the practical needs of occupants.

Los Angeles is full of soft-story apartment buildings: tuck-under parking below, living space above, and a few skinny columns holding it up. Those columns were designed for gravity, not for an earthquake pushing the building sideways. In Northridge in 1994, many of them failed. Retrofitting them is the law in LA, and it doesn't have to cost you your parking.

Downtown buildings at nightStock image: replace with project photography

What is a soft-story building?

A soft-story building has a level that is substantially less stiff or strong than the floors above—often the open parking level beneath apartments. Evaluation and retrofit design look at how earthquake forces move through the building and where additional lateral resistance is needed.

How do you retrofit without losing parking?

Parking, access, and the way residents use the building matter. We explore feasible locations for strengthening elements, including steel frames or other systems, while coordinating with the architect and contractor on constructability.

What about older concrete buildings?

Non-ductile concrete buildings lack the reinforcing steel needed to bend without breaking in an earthquake, and LA requires many of them to be evaluated and retrofitted. The compliance timeline is much longer than the soft-story program verify, which rewards owners who plan: phase the work, budget for it, and line it up with tenant turnover and renovations you're already doing.

Seismic retrofit FAQs

How do I know if my building is on the Los Angeles soft-story or concrete retrofit list?

LADBS publishes the program lists and sends orders to affected owners. If you aren't sure, send us the address and we'll help you check and explain what the order requires. verify

Will my tenants lose parking during or after a soft-story retrofit?

Not if we can help it. Our method hides new columns behind existing ones and runs a thin strap above the ceiling, so usable parking is preserved after the work.

How long does a seismic retrofit take?

Design and plan check usually take a few months, and construction depends on the building. Starting early lets you phase the work and avoid paying for a rush.

What is non-ductile concrete?

Older concrete construction without enough reinforcing steel to flex in an earthquake. It can fail suddenly rather than bending, which is why LA requires evaluation and retrofit for many of these buildings.

"A lot of what I design hides in the ceiling. You won't see it, but you'll see the signs of it." — Darren Watson

Got a retrofit order, or think you might?

It's a short conversation.